Abdhy Gazali, Rina Asri Aisyah, Yusuf Maharani, Prama Putra, Alfandi Ziqri
The construction industry faces ongoing challenges in quantifying the benefits of Lean Construction and the Last Planner System (LPS) in practical applications. To address this issue, the study examines data from 40 LEGO-based construction simulations designed to explore key parameters influencing project outcomes, including cost, waste, time, safety, defects, and Percent Plan Complete (PPC). Using statistical methods like correlation and sensitivity analyses can provide valuable insights. The research identifies cost as the most sensitive factor, while material waste management emerges as a critical driver for improving efficiency. Safety and defect reduction also significantly enhance PPC and overall project performance. By mimicking real world construction scenarios, these simulations provide valuable insights into the practical application of lean principles. The findings highlight the effectiveness of LEGO construction simulations in bridging the gap between theoretical frameworks and on-site implementation, offering actionable recommendations for optimizing construction processes and advancing lean practices. © 2025, International Group for Lean Construction. All rights reserved.
Building Engineering Education, State University of Jakarta (UNJ), Indonesia; Indonesian Professional Society in Lean Construction Management (IAMKRI), Indonesia; Strategy Engineering, and Technology Division, PTPP, Indonesia; Bandung Institute of Technology (ITB), Indonesia
Research at a Glance
Register to unlockTopics & SDG Alignment
Register to unlockCollaboration
Register to unlockAuthor Profile (Selected)
Register to unlockReferences Overview
Register to unlockJournal & Source
Register to unlockMetadata & Integrity
Register to unlock